Lead time is approximately 30 days for the base kits/barrels, and 45 days if we are doing the denials. Denials are done on an as-requested basis.
This kit includes the full BOM for the NYLAUG including the materials needed for the denials.
Hardware kit includes:
1x 300mm steel OP-Rod Bushing
1x 12" Section of 3/16 Keystock
5x M3x300 threaded rod
12x M4 Threaded inserts
2x M3 Threaded inserts
8x ~M4 Bolts (these are for the top rail & handguard, which is compatible with different length screws)
4x M4x4 Grub Screws
4x M3 Nylock Nuts
4x M3 Jam-nuts
8x M3 Washers
4x M3x8 bolts
2x M3x16 bolts
This does not include the tools required or filament.